Automatic dosing device maintenance plan and precautions:
Weifang Shanshui Environmental Protection Machinery Manufacturing Co., Ltd. is located in Weifang, a beautiful world kite capital on the bank of Bailang River. The company is located at No. 289, Gongjian Road, Weicheng District, Weifang City. Our company mainly deals in water treatment products involving clean water and sewage treatment equipment. The company's products include: chlorine dioxide disinfection equipment, dosing equipment, integrated sewage treatment equipment, water purification equipment, environmental protection machinery and other 30 kinds of environmental protection equipment.
Dosing equipment maintenance schedule
every week
Clear the transparent cover of the dosing system mixer to clean / check the dosing system nozzle and mixing tube
Clean / check the heating hopper and venturi ejector
Cleaning / checking the rotary level gauge
per month
Clean all motor fan guards clean / check water circuit control lubrication dosing screw shaft drive bearings every 2500 hours - check the operation of the transfer valve and water control electric ball valve
lubricating
In order to ensure trouble-free continuous operation of the dosing equipment, it is necessary to lubricate the lubrication parts of the dosing.
Grease lubrication: The solid feeder drive bearing is lubricated with No. 3 calcium-based grease, refueling once every half month, and replaced during maintenance or 12 months.
Motor use and maintenance
1. Motor use and maintenance
See the motor's operating and maintenance instructions or operating instructions.
2. Screw pump use and maintenance
Operational precautions
1. The dosing metering pump motor is controlled by the inverter, and it is found that the dosing metering pump can not work normally. It may be the inverter fault. At this time, another unit (normally used and one standby) should be activated, and the fault should be reset according to the manual.
2. The level gauge of the material during use wet adhesion material, thereby affecting the surface of the material using the effect of the switch should always check the dosing device and the wiper (recommended once per shift).
3. The control cabinet of electrical components prohibition water, should be used normally closed door, rinsed with water to eliminate the control cabinet. Otherwise the electrical components will be damaged.
4. Due to the strong corrosiveness of the chemicals, the mechanical parts in contact with the chemicals should be inspected regularly and replaced in time.
5. If the internal screen of the feeder is damaged, please replace it in time to avoid the bulk of the dry medicine from being fed into the screw feeder, damage the screw or drive the motor.
6. Two pressure level gauges should check and clean the film on the center of the head every other month.
7. Because of the sticky agent has, in the feed conduit should be noted that blowing is smooth, and particularly below the hopper discharge opening two.
8. When normal, open the end cap of the upper hopper and have downward suction. If there is no suction or anti-wind, the feeding pipeline is not smooth, so check it in time. (It is recommended to open and inspect every 20 hours of dosing )
9. There is a heater in the hopper. When the air is supplied normally for a period of time, the feeding tube is slightly hot. If there is no change, the heater is damaged and should be checked and replaced in time.
10. The inlet valve and the discharge valve are automatic ball valves. After the shutdown, there is still water flowing in or the medicament flows out, indicating that the inlet valve and the discharge valve are damaged, and should be checked and replaced in time.
11. Dosing and metering pumps are forbidden to idling and reversing. Before opening the pump, it must be determined that the valves before and after the metering pump have been opened, and the medium needs to be injected beforehand.
All employees of Shanshui Environmental Protection serve the customers with high-quality products and perfect after-sales service, and strive for excellence and pioneering spirit. We are willing to treat each user sincerely.
Wyślij je do tym dostawcy
January 03, 2024
January 03, 2024
Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.
Fill in more information so that we can get in touch with you faster
Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.