Hunan Water Pump Factory Provides Mounting Method that Enables PWDDFL Multiple Head Sewage Pump Efficiency Abstract: This article was published by Tianhong Pump Industry Co., Ltd. in Hunan.
Keywords: Hunan Water Pump Factory, PWDDFL multi-suction sewage pump, efficiency, installation method
Deviations when installing the PWDDFL multi-tip blowdown pump also affect efficiency. So be mindful of the following installations: 1. The installation height should be less than the allowable suction vacuum height minus inlet pipe losses. Under standard conditions, the installation height is ≤10.3-(NPSH)r-0.5-hw, which is the hydraulic loss of the suction line; 2. PWDDFL multi-suction sewage pump outlet flange should be equipped with a pressure gauge in order to observe and control the pump operating conditions; 3. The weight of the pipeline must not be accepted by the pump; 4. PWDDFL multi-suction sewage pump should be installed in a ventilated place, outdoor installation should add a protective cover to avoid sun exposure and rain.
More Related Articles Recommended: PWDDFL Series Multi-head Sewage Pump Seals Requirements and Analysis of Pollutant Price Causes of jamming during operation of multi-suction blowdown pumps analyzed by Hunan pump manufacturers |