Zeus pump to teach you the safe operation of concrete pump presentation
June 30, 2022
1, The operator of concrete pump truck shall be specially trained, be familiar with the mechanical performance of pump truck, master the operation method and precautions of pump truck, earnestly perform the safety responsibilities of this post in production and abide by the relevant safety regulations on site. 2, with concrete pump delivery of concrete, should comply with its use and operating procedures, pipe joints, safety valve must be intact, the pipe rack must be solid, and with the pump site structure template from the self-supporting system, prior to delivery test with water , The pressure relief must be overhaul, after the repair must be sent. 3, the use of concrete admixture, the admixture of personnel to be careful operation, beware of corrosion. 4, concrete pump truck parking site to be hardened, parked smooth, solid, with good drainage facilities to prevent collapse. 5, concrete pump truck before taking over the use of pipe, to be carefully checked, if the pipe wall cracks, wear leakage, the body of serious wear and tear, joint damage and other phenomena should be repaired or stopped using to prevent the delivery of concrete pressure in the Under the pressure of an accident. 6, pump pipe connection, the erection must be reliable and solid, when flying across, you must set up steel pipe rack, in order to prevent the swinging process of pumping, anchoring reinforcement can be used. 7, concrete pump truck connection, you must use a good special latch, the construction should have spare latch and vulnerable parts. 8, pumping concrete, the two sides of the catheter shall not stand within 1 meter range, to prevent the catheter swinging wounding; catheter outlet is prohibited within 30 meters in front of people, to prevent the pump air, pump out the pressure Aggregate wounding. 9, adherent installation, removal of the catheter, the operator must comply with aerial safety requirements, fasten the seat belt (rope); catheter installation must be firmly connected with the wall to prevent dumping. 10, install, remove the pump tube, the labor should be sufficient, can not be hard access, hard disassembly; concrete delivery pressure water pump, the pressure plug should be quickly and accurately pick up, warehouse personnel to pay attention to the discharge port Spray water down construction workers. 11, the catheter can not be demolished when one of the sections are not to be removed, should follow the top-down, before and after the principle of removal of the catheter can not be thrown directly from the top, lost; catheter removed must be placed on a smooth field, not random piling On the shelf. 12, after the pump tube is disassembled, it must be lifted to a flat place to rinse it cleanly, check it in place, and repair it if it is damaged. 13, concrete pump truck operation, should be arranged full-time staff, often around the catheter inspection whether the phenomenon of loosening at any time, and check the catheter fixed shelf, the stability of the stent, the catheter has no obvious damage.