Vertical slurry pump installation points, vertical slurry pump installation steps diagram
September 11, 2022
Vertical slurry pump is used to transport a variety of industrial liquid vacuum pump, the pump in the case of corrosion resistance can wear-resistant, can adapt to the environment, vertical slurry pump installation is very important, We should be installed in accordance with the requirements of the installation, in order to avoid abnormal use of the process. Vertical slurry pump installation points, vertical slurry pump installation steps Illustration (1) The bearings were mounted on the bearing box and bearing seat. (2) Felt ring mounted on the bearing cap A, C and bearing box. (3) B, C mounted on the bearing housing and bolted. (4) Put the bearing bearing box on the shaft, screw on the round nut, and fasten the bearing end cap A on the bearing box (US ,, treasure). (5) Fit the shaft into the bearing housing, fix it with bolts, screw the adjustment screw, and install the bearing on the bearing seat. Place the retaining ring in place on the lower bearing. (6) The coupling pipe is fixed on the bearing seat, and the pump cover is installed on the lower part of the coupling pipe. The impeller is mounted on the lower part of the shaft and tightened, and the front cover of the pump body is installed in turn, and bolted, and the adjusting screw Adjust the gap between the impeller and the front cover, (controlled within 1 - 1.5mm) adjusted with a nut, bolt fastening. (7) The motor support installed in the bearing seat bolted to the shaft at the top of the shaft coupling parts, and the motor coupling fastening screws fastening the motor shaft, the motor mounted on the motor support, And with bolts, nuts fastening. (8) The asbestos pad, the elbow, and the discharge tube are installed from the order of the pump and fixed on the support seat. (Editor: Huang Nengwen QQ:)