Zeus pump FSB series fluorine plastic corrosion-resistant pump start and stop matters needing attention
August 13, 2022
Start and stop belonging to Zeus pump FSB series fluorine plastic corrosion-resistant pump operation which two important steps, then the pump start-up and parking assembly, you need to pay attention to what matters? Zeus pump FSB series Corrosion-resistant fluorine plastic pump start and stop Notes 1. Check the direction of motor rotation, whether the same pump rotation mark. 2. FSB pump check before starting the oil chamber is within the provisions of the oil level. 3. Open the inlet valve, fill the pump with liquid (fluid). 4. Close the outlet valve. 5. After the above steps are completed, start the motor slowly open the outlet valve, then the position of the pressure gauge will change with the size and change of the water outlet, when the pressure gauge pointer points to the desired position, stop the water valve adjustment. 6. When you need to stop, first close the outlet valve, cut off the power, and then close the inlet valve. Read more: Pumps Valves Pipe Fittings Exhibitions Water Expo Xiamen Maritime Exhibition Internet + Forum Yiwu Expo Fair Mold Top Ten Brands Industrial Internet (Xiamen) Technology Co., Ltd. Asia Pump Network Editor: He Duanhui (QQ / WeChat:) http://beng.liuti.cn/ (service hotline:)