Zeus pump FSZ anti-corrosion self-priming pump precautions
August 12, 2022
Zeus pump FSZ corrosion-resistant self-priming pump can be used to suck up to 80 ℃ temperature within the corrosive serum, then when using the pump, you should pay attention to what matters? The following is about the Zeus pump FSZ anti-corrosion self-priming pump precautions introduced. Zeus pump FSZ anti-corrosion self-priming pump Notes 1, check the motor running direction in the pump running direction mark is consistent, do not reverse! 2, the pump body to be filled with liquid to start running, non-rotating. Pump within the specified self-priming height range if 5-8 minutes can not self-priming fluid, stop immediately check the reasons to prevent the pump working fluid warming, damage to the pump. 3, the first injection in the pump after the general do not need to re-injection, but downtime is long or sealed in the leak there after the existence of the phenomenon of liquid loss in the pump, the second drive, to check the pump memory fluid situation , Then boot. 4, the installation of cooling water pump before starting, you should put the cooling water (tap water), water pressure does not exceed 0.02Mpa, its main role is (a) cooling seal system to prevent damage to the seal, thus damaging the impeller. (B) is to flush the seal, increasing seal life. 5, the bearing should be regularly put in the top of the filling hole in the injection of 20 # oil, half the amount of oil to the mirror limit, in order to increase the life of bearing operation. 6, long-term winter does not use, should drain the pump liquid, so as not to be frozen, can not work properly. Read more: Pumps Valves Pipe Fittings Exhibitions Water Expo Xiamen Maritime Exhibition Internet + Forum Yiwu Expo Fair Mold Top Ten Brands Industrial Internet (Xiamen) Technology Co., Ltd. Asia Pump Network Editor: He Duanhui (QQ / WeChat:) http://beng.liuti.cn/ (service hotline:)