Zeus pump FSZ corrosion-resistant self-priming pump installation considerations
August 12, 2022
Zeus pump FSZ corrosion-resistant self-priming pump installation quality is good or bad, relates to the quality of the pump, or even the life of the pump, so in installing the pump, you need to pay attention to the following: Zeus Pump FSZ corrosion-resistant self-priming pump installation notes 1, the pump arrived at the production site by long-distance transport, the installation must be checked before the complete machine components are intact, fasteners, if loose, should be tightened to check the pump shaft, motor shaft Concentricity, if any, should be corrected. 2, the installation of suction pipe to minimize pipe hydraulic losses, shall not be installed less than 90 degrees elbow, inlet pipe 90 degrees elbow no more than 2, the pump inlet should be set to prevent large debris into the pump Within the pump to ensure normal operation. 3, the inlet pipe connection bolts should be tightened, the seal must be tight can not leak, otherwise it will seriously affect the self-priming pump performance. 4, into the water pipe or liquid pipe should be installed one-way check valve to prevent siphon during parking occurs, install the check valve should pay attention to vertical installation as possible. Read more: Pumps Valves Pipe Fittings Exhibitions Water Expo Xiamen Maritime Exhibition Internet + Forum Yiwu Expo Fair Mold Top Ten Brands Industrial Internet (Xiamen) Technology Co., Ltd. Asia Pump Network Editor: He Duanhui (QQ / WeChat:) http://beng.liuti.cn/ (service hotline:)